Your ERP is a decade old and half the plant runs on paper and inboxes. We build the systems in between and connect them to what you already run.
of ERP age is no blocker: we build on top, the plant keeps running
from first scoping call to working software in production
production stops during rollout
Everyone is afraid to change it, so workarounds pile up in Excel and the real process lives outside the system.
Clipboards, whiteboards, and printouts. Every handwritten entry is a number that never makes it into history.
Ten small systems get quoted as one big one, priced at eighteen months. So nothing gets built at all.
Modern screens and workflows on top of the ERP nobody wants to touch. The system keeps running. The pain stops.
Who works when, on which line, with hours flowing straight into payroll.
Machine issues reported, prioritized, and tracked to resolution.
Digital inspection protocols with photos, signatures, and full history.
Stock levels watched automatically. Reorders triggered before the line stops.
Order confirmations and delivery notes read and booked automatically.
A 25 minute call, then a fixed written scope: the system, the metric it moves, the timeline.
Working software in production, iterated with the people who actually use it.
Reported to leadership weekly, then extended across the business.
The plant already runs lean. Now the paperwork does too.
Each one is a working starting point in the factory, deployed and adapted to your stack by our engineers.
Bring us one concrete problem and get a straight answer on whether we can move it.